How to Prepare for Shed Delivery: A Complete Site Checklist
A smooth shed delivery starts well before the truck arrives. Final placement, permits, foundation work, and access should be handled early so the delivery team can position the building efficiently and safely. Use this checklist as a planning guide, then confirm the exact requirements for your building and property with the Pro Star Cabins team.
1. Confirm Permits and Placement Rules
Contact the appropriate local offices and review any neighborhood restrictions before preparing the site. Requirements can vary based on the building's size, intended use, foundation, and location.
City or county building permits
Zoning, setbacks, property lines, easements, and rights-of-way
Homeowners association or neighborhood covenants
Septic systems, drainage areas, underground utilities, and overhead lines
Foundation, anchoring, wind-zone, or engineered-plan requirements
Avoid pouring a permanent pad or making major site changes until the location and specifications have been approved by the applicable authorities.
2. Choose the Final Building Location
Select a location that is practical for delivery, daily use, drainage, and long-term maintenance. Walk the area and consider how the doors, windows, ramp, porch, or garage opening will face.

Choose firm, well-drained ground whenever possible.
Allow room to open doors and use a ramp safely.
Leave maintenance access around the building.
Consider future fences, landscaping, driveways, and additions.
Mark the building corners and desired door orientation clearly.
3. Select and Prepare the Foundation
The correct foundation depends on the building, local requirements, soil conditions, and intended use. Confirm the required dimensions and construction details before work begins.

Concrete pad: A durable, clean option that should be built to the specifications provided for the selected building.
Compacted gravel pad: A common option that can support drainage when it is properly excavated, edged, leveled, and compacted.
Approved block or pier system: A more economical approach for some buildings, but placement and support must match the building and local requirements.
The finished foundation should be level, stable, and ready before the delivery appointment. Ask the delivery team whether the pad should match the building footprint or extend beyond it.
4. Check the Entire Delivery Route
Measure the route from the road to the prepared site, not just the final location. The building and delivery equipment need room to enter, turn, and maneuver.

Measure gates, driveways, and openings between fences or structures.
Trim low branches and identify roof overhangs or other overhead obstacles.
Note power, cable, and communication lines. Never attempt to move utility lines yourself.
Identify steep grades, tight turns, ditches, bridges, culverts, and soft ground.
Move vehicles, trailers, equipment, debris, and other temporary obstructions.
Send site photos and measurements in advance when access may be limited. The delivery team can confirm the clearance required for the building and equipment.
5. Prepare the Ground and Surroundings
The site and approach should be dry, firm, and clear on delivery day. Wet or unstable ground can damage the property, affect placement, or require rescheduling.
Remove debris, tall vegetation, and loose materials from the site.
Trim branches and clear the path to the foundation.
Unlock or remove gates only when arrangements have been confirmed.
Mark sprinkler heads, septic components, utility areas, and hidden obstacles.
Keep children and pets away from the delivery route and work area.
6. Confirm Anchoring and Tie-Down Requirements
Anchoring requirements may depend on local code, wind exposure, building type, and foundation. Do not assume anchors or tie-downs are included automatically.
Ask whether anchoring is required for your location and building.
Confirm who supplies and installs the system.
Verify cost, timing, inspection, and access requirements.
Keep any installation or compliance documentation with your building records.
7. Be Ready on Delivery Day
An adult who can approve placement should be present and reachable. Last-minute orientation or access decisions are easier to resolve before the building is unloaded.
Confirm the address, placement, and door direction.
Make sure the route is unlocked and clear.
Keep a phone available for delivery-team questions.
Keep people, pets, and vehicles out of the active work area.
Confirm any documents or payment steps directly with the Pro Star Cabins team before the appointment.
8. Inspect the Building Before the Team Leaves
Once the building is in place, take a few minutes to review the delivery with the team.

Confirm the building is placed in the approved location and orientation.
Check that doors, windows, locks, and latches operate properly.
Look over the siding, trim, roof, and other visible surfaces.
Confirm that keys, accessories, and available documents are present.
Photograph the completed placement and note any concern promptly.
After Delivery
Keep water draining away from the foundation and follow the maintenance and warranty documents supplied with the building. Electrical, plumbing, insulation, climate control, and interior work should be completed by qualified professionals and in accordance with local requirements.
Keep your order documents, permits, delivery photos, and product information together. If you need building documents or need to report a concern, use the appropriate Pro Star Cabins request form and include clear photos and order details.
Quick Delivery Checklist
Permits and placement rules confirmed
Final location and door orientation marked
Foundation complete and level
Delivery route measured and cleared
Ground firm, dry, and accessible
Utilities and hidden obstacles identified
Anchoring requirements confirmed
Adult decision-maker available
Building inspected after placement
Plan Early for a Smoother Delivery
Good preparation protects your property, reduces avoidable delays, and helps the delivery team place the building correctly. Contact Pro Star Cabins before delivery with the building dimensions, site photos, delivery address, and any access concerns so the team can help you prepare.